Here's why Google can pull off demand response at 1 GW scale: they own everything. The facility, the workloads, the utility relationship. One company, one decision. But over 70% of data centre capacity is multi-tenant colocation - Equinix, Digital Realty, CoreSite, hundreds of smaller operators. These buildings house thousands of tenants running workloads the operator can't see, let alone control.
The colo operator can cycle HVAC and fire up backup generators. That gets you 10-15% load shed. Fine for a press release, not for a grid programme. The real flexibility - the compute itself - sits one layer up, with enterprise tenants who have no relationship with the utility and zero incentive to participate.
So you've got three parties who all want the same thing and can't coordinate. The utility needs controllable demand. The colo operator wants faster interconnection and cheaper rates. The tenant wants a lower power bill. The economics line up perfectly. The product connecting them? Doesn't exist.
The play: a three-sided flexibility broker for multi-tenant data centres. Utilities get a controllable load resource they can dispatch. Colo operators qualify for flex tariffs and jump the interconnection queue. Tenants earn credits on their power bills for workloads they didn't need running at 3pm on the hottest Tuesday in August.